Smart Energy Meter Installation - PAN India

Contact: Ram Babu,9740994158 or mailto:mintdollars@gmail.com or Skype:host2indiaa,else contact J M THARANI,7259329046 or mailto:jmtharani@gmail.com or Skype:jmtharani
Smart Energy Meter Installation -  PAN India


Overview:
                    An automatic remote meter-reading system based on GSM is is useful to obtain meter reading when desired so meter readers don’t need to visit each customer for the consumed energy data collection and to distribute the bill slips. Microcontroller can be used to monitor and record the meter readings. In case of a customer defaulter, no need to send a person of utility to cut-off the customer connection. Utility can cut off and reconnect the customer connection by short message service (SMS). Furthermore, the customer can check the status of electricity (load) from anywhere. In this system energy meter readings are being transferred by making use of GSM

Feautures: 

   Get automatic reading of Energy Meter and sent it to consumer as well as to utility.
   In reading it measures Voltage, Load Current, Real power, Reactive power, Power factor and units consumed.
  Utility is able to cutoff/restore the supply of the defaulter through SMS.
 Smart Energy Meter responds to the SMS and sends you back the readings whenever it is asked.
 Consumer is able to check the status of his load from anywhere in the world by SMS.


    




     






Working of Smart Meter:

  GSM communications network is used to transfer the Electricity consumed data to the utility administration as well as to the customer when demanded. Antenna, attached on or near meter box, can be used for improvement of signal strength in GSM communication.
  Smart metering communication is centralized meter reading, so meter readers don’t need to visit each customer for data collection. However, for testing and maintenance meters may need to observe occasionally.
   The main duty of Smart Energy Meter is to measure the meter reading and sends it to utility when demand as well as to costumer. The voltage and current sensors measure the RMS values of voltage and current and feed them to microcontroller, where calculations for active and reactive power are performed.
  In Smart Energy Meter we used sensors to measure voltage and current instead of current and voltage transformers. The reading from Utility administration SMS is being received by smart energy meter programmable interface and the action is performed by the meter according to provided information.
  A major feature of Smart Energy Meter is that utility company can cut off and reconnect the connection of energy of any user with the help of SMS without sending the person to perform the task manually. It can be utilized in case when the utility company needs to disconnect a consumer due to non-payment of bills or some other reasons.
  Another major feature of Smart energy meter is that it gives alarm when the consumer load is exceeding the upper limit for which he got the utility connection. In case consumer does not reduce his load meter automatically cut off the consumer connection.

Scope of Work:

          Dismantle of the existing Single/Third Phase Energy meters and handing over the same to the XXXXXXX Store with final reading & receipts.
 Installation of Electronic KWH Meter Single Phase Two Wire (10-60A) with Meter Box and SMC board in place of Single Phase energy meter for existing connections or Installation of Electronic KWH Meter Single Phase Two Wire (10­60 Amp) for new connections.                                      
  Removal of the existing Service cable and handing over the same to XXXXXXX Store taking received of return and length /quantity.
 Installation of 2x4 sq. mm. armored service cable with Centenary wire and reel insulator in place of old and removed service cable for existing connection or installation of 2x4
sq. mm. armored service cable with Catenary for new connections.
 Following are the details of work that shall be in scope of the contractor on his own cost:
              * Arrangement of transportation of Energy Meters and
                 Service Cable from XXXXX store to installation Site for
                 installation.
             * Arrangement of transportation for shifting all old
                removed Single Phase Meters and cable to respective
                  stores of XXXXXXX.
      * Complete data entry in all fields in "Sealing Record
         Format" during installation of energy meter.
       *  Filling in all the necessary record in the XXXXX App
               loaded in mobile of your technician and submitting the
               same on the spot.
           * Understanding the Phase and Neutral connections at
              consumer premises and ensuring proper connections of
              the new installation with due checks after electrical  
              connections as per the "Installation Process Video".
          *  All New Installed sites must meet the requisite safety
              standards and shall comply with the requirements laid 
              down by the M/s. XXXXX.
     * Contractor shall ensure a close coordination with XXXXX
            Engineers during installation and shall honor the        
                         decisions taken by them, in the interest of the business.
* Collect installation completion certificate from concern
            division official. Get MB book entry with coordination of
              concern officials for invoice process.
Commercials:
  For the services rendered by the Vendors, they shall be entitled for payment of Rs.200/- price per meter(Single Phase) and Rs. 240/-(Three Phase) . The aforementioned rates shall remain in force till expiry of the contract from the date of commencement of the work.
   Materials provided by company at site.
  The rates so fixed are inclusive of all taxes (other than Service Tax), duties, and levies etc imposed by the State/Central Government and Local Bodies as on the date of award of the work. Nothing shall be payable extra under any circumstances. However, TDS will be deducted as per Income Tax.

Volume:

    Single/Double Meter -> Per District Minim 50,000 to 60,000 Meter. 
Billing Cycle:


   Vendors shall issue invoice on every 25th – 30th on monthly basis.
   The Invoice can be raised through e-mail or Fax and followed by hard copy.

Terms of Payment:  


  80% payment will be released after submission of MCR along with signature of concerned Section Officer (AE/JE), and work completion report from Sub division Officer (AEE) and EE, subject to reconciliation of pervious bill if any.
   20% payment will be released after reconciliation of material.

Payment Processing:

   Payments to Vendors will be done within 45 days from the verification report Issued by the designated authority. 

Penalty

Delay in Execution of the Work:

  The penalty shall be applicable as per installation schedule provided by project manager. Failure to deliver the outcome as per the committed volume and time line shall call penalty and necessary deduction shall be made from your running bills.
Delay in Execution of the Work:


   Lost & Damaged and Theft of DTC Meters: Contractor shall pay the cost (Rs. 1000/- for new meter, Rs. 100/- meter length of cable and Rs. 500/- for each old meter) to M/s XXXXX in case of any loss, Damage and theft etc, after issuing to contractor and same shall be deducted from his running bills. Contractor shall also lodge FIR with concerned Police Station and copy of the same shall be provided to Ms/ XXXXXX.


To Signup Work order:


Ø Signing up with PAN INDIA Company. All state are available.
Ø Security Deposit to the Primary Company/Pan India Company will be applicable
Ø Business Procurement Fees (Consultancy Charges) shall be discussed.
Ø After Sign up, the next day live work will be started.

Document Required For Center (Vendor):

Ø One Cancelled Cheque
Ø PAN Card
Ø Company/Firm Profile
Ø Company / Firm Service Tax
Ø Owner Address Proof
Ø Owner Id Proof
Ø Owner Photo
Ø Bank account Statement of 6 Months
Ø Bank Account Details(Company Account)
Ø Valid Electrical License before commencement of the Installation work.

Note:  The Projections Shown here are assumptive and fictitious. It is about to change or edit or it may be more or less & it is not final. Author of the Document is nowhere responsible.




Regards,


  ☂Mr. Rambabu,    🖁 Mob : +91- 9740994158, :host2indiaa

☂Ms. J M Tharani,  🖁 Mob : +91- 7259329046,  : jmtharani


Comments

  1. Sir we are interested to become a vendor for the cow tagging insurance and installation of
    Meter project at odisha. Please contact us in my no 7684086916

    ReplyDelete

Post a Comment